[1]
A.V. S. SREEDHAR KUMAR, V. VEERANNA and B. DURGAPRASAD 2015. Multi Objective Scheduling of Jobs in Flexible Manufacturing System Using Metaheuristic Approaches with Inclusion of Simulation Modeling. International Journal of Computer Engineering in Research Trends. 2, 4 (Apr. 2015), 264–269.